Search Results
Qatar Petroleum Industrial Port | Case Studies | DSEGenset
Qatar Petroleum is responsible for all phases of the oil and gas industry in Qatar. During the past few years Qatar has continued its climb towards becoming the world leader in the production and export of Liquid Natural Gas (LNG) and plays a major role in the country’s growing GDP.The industrial city of Ras Laffan is a key location for much of Qatar Petroleum’s activity and is located north east of Doha covering 106 square kilometers. Run by a management team appointed by Qatar...
https://www.deepseaelectronics.com/genset/casestudies/15/qatar-petroleum-industrial-port/15/qatar-petroleum-industrial-portShipping Company uses DSE | Case Studies
MSC (Mediterranean Shipping Company S. A.) is a privately owned company and is now one of the leading shipping lines of the world. Recently voted Best Ocean Carrier of the Year 2007, the shipping company boasts a fleet of 360 container vessels.In a recently completed 2-year project, DSE Italian distributor Bruno Srl. supplied MSC with gensets for continuous power supply applications in cargo vessels through the fleet. Sets used Cummins engines along with DSE controls 5310 Auto Start, 5320...
https://www.deepseaelectronics.com/casestudies/28/shipping-company-uses-dseEmergency Back-up Power & Synchronising System | Case Studies
Power interruptions are the standard not the exception and it was necessary to have emergency diesel power on hand to keep the manufacturing of tea going at all times. The existing system had three generators:1 x 350kVA Iveco coupled to a Newage alternator with a MX341 AVR, 2 x newer Iveco 400kVAs coupled to Mecc Alte spa alternators fitted with UVR6 regulators.Only two of the three sets would synchronise with each other even though the third could supply power by itself. Synchronising was...
https://www.deepseaelectronics.com/casestudies/16/emergency-back-up-power-synchronising-systemProviding Power to Remote Locations | Case Studies
Generation AFRICA is an organisation identifying and empowering outstanding young Africans to take responsibility for their families, communities and nations. It also connects businesses around the world to this dynamic generation.The project parameters were to provide power to remote commercial and up-market safari lodges in the most cost effective way, to provide a living for local communities. Load variations at the lodges varying from 5kVA to 100kVA, that can remain at either end of the...
https://www.deepseaelectronics.com/casestudies/18/providing-power-to-remote-locationsPower Station Load Sharing & Synchronising | Case Studies
Synchronizing Controls for 10 no’s of Generators (800 KW to 1600 KW – 15MW total). This system was set up as a power station and has been running problem free for over 2 years.
https://www.deepseaelectronics.com/casestudies/19/power-station-load-sharing-synchronisingGenerator Mounted Synchronising Stations | Case Studies
Requirement for approximately 150 to 200 numbers of generator mounted synchronising stations. Each station will be self contained (i.e. complete motorised breaker and fully automatic synchronising controls) and is to be mounted in the same container of the generator.There are two requirements for this application.1. For rental generators.The rented company will rent the number of generators according to the power requirement of their client (e.g. 4000KW will be with 4x1000 KW generator...
https://www.deepseaelectronics.com/casestudies/20/generator-mounted-synchronising-stations11-Set Load Sharing System | Case Studies
One of the largest shirt manufacturers in the Guangdong Province of China is situated in Dongguan. The factory enjoys high volume worldwide sales. The factory already had an existing PCC paralleling system in operation, providing prime power, but this needed updating due to problems on automatic load demand. DSEs distributor, CECL won the contract after close liaison with the panel builder, to replace the 11-set system with DSE 5510 controllers. Engine specs were 4 x Cummins KTA19...
https://www.deepseaelectronics.com/casestudies/21/11-set-load-sharing-systemReal Estate Project, Pakistan | Case Studies
Park Lane Tower is a high profile complex of luxury apartments, office suites and designer retail shopping outlets. The multi-story building offers 0.5 million square feet of high end commercial real estate in the capital city of Lahore, Pakistan.In a project completed at the end of June 2007, Pyramid Automation provided a synchronising system with mains monitoring for standby power. The system uses CAT-3516 1750Kva x 2 and CAT-3502, 1000Kva x1 engines with Woodward governor 2301. The...
https://www.deepseaelectronics.com/casestudies/22/real-estate-project-pakistanMiddle East Telecommunications Company | Case Studies
Backed by the Abu Dhabi Group, one of the largest financial groups in the Middle East and the single largest foreign investor group in Pakistan, Warid Telecommunications (Pakistan) launched its services in May 2005. Within 80 days of launch, Warid Pakistan claims to have attracted more than 1 million users. According to Pakistan Telecommunication Authority,Warid Telecom currently has more then 10 million subscribers in Pakistan and is ranked as the fourth largest operator. Warid Telecom´s...
https://www.deepseaelectronics.com/casestudies/24/middle-east-telecommunications-companySri Lanka Emergency Power Systems | Case Studies
Dialog Telekom is the largest GSM mobile telecoms company in Sri Lanka and they recently contracted to have 130 new emergency power systems installed at locations throughout the island.The systems are to provide emergency power as a standby to the mains supply and will ensure that disruptions to their network service caused by power failures will be kept to a minimum.50 systems using DSE710 Auto Start modules have already been completed with a further 80 scheduled for later in the...
https://www.deepseaelectronics.com/casestudies/25/sri-lanka-emergency-power-systems