Search Results
DSEP100
Mains Decoupling Relay
FULLY G99/1 & G98/1 COMPLIANT The DSEP100 G99/G59 Mains(utility) Protection Relay detects changes in the mains (utility) supply to which the distributed energy resource (DER) is connected. If a mains (utility) failure is detected, the DSEP100 will disconnect the equipment in line with national...
DSEP100 Meets the Changing Standards of G59/G99 | News
From 27th April 2019, G59 has been replaced to meet grid code changes. Since that date all new equipment connecting to the network in GB must comply with G99. In addition, G59 has been amended retrospectively, affecting 50,000 existing connected applications. To address stability issues on the grid, the new grid codes widen the parameters for LOM detection and forbid the use of Vector shift, to reduce tripping incidents in a non-islanding event - staying connected through...
https://www.deepseaelectronics.com/news/138/dsep100-meets-the-changing-standards-of-g59-g99TECHNICAL FOCUS - Imminent Grid Code Changes and how they could affect your connected application | News
Increasing demand for renewable energy, along with the requirement for stable grid/utility networks, is driving major changes within the power industries across GB, Europe and the USA – and the changes are imminent. To find out how DSE's P100 can help you meet the new regulations please click hereWith a commitment to finding greener alternatives for generating power, the number of inverter connected appliances feeding power into the mains/utility networks from such as solar...
https://www.deepseaelectronics.com/news/96/technical-focus-imminent-grid-code-changes-and-how-they-could-affect-your-connected-applicationDSEP100 Mains Decoupling Relay Software Downloads
FULLY G99/1 & G98/1 COMPLIANTThe DSEP100 G99/G59 Mains(utility) Protection Relay detects changes in the mains (utility) supply to which the distributed energy resource (DER) is connected.If a mains (utility) failure is detected, the DSEP100 will disconnect the equipment in line with national and international DNO requirements. This removes the risk of an islanded grid being formed and protects DER equipment.DSEP100 is suitable for use with all DER equipment supplying power in parallel with...
https://www.deepseaelectronics.com/genset/mains-utility-protection-relays-power-meters/dsep100/softwareP100 used in Solar application | Case Studies
The German-Jordanian University has a student body of around 5,000 Jordanian and international students. In the carparks, roof top carports are utilised for solar panels providing up to 2.11 MW of power while providing shade to the cars during the heat of the day. The solar panels are divided into 6 different areas and each one is connected to the grid using a DSE P100 Mains Decoupling Relay.
https://www.deepseaelectronics.com/casestudies/55/p100-used-in-solar-applicationP100 used in Solar application | Case Studies | DSEGenset
The German-Jordanian University has a student body of around 5,000 Jordanian and international students. In the carparks, roof top carports are utilised for solar panels providing up to 2.11 MW of power while providing shade to the cars during the heat of the day. The solar panels are divided into 6 different areas and each one is connected to the grid using a DSE P100 Mains Decoupling Relay.
https://www.deepseaelectronics.com/genset/casestudies/55/p100-used-in-solar-application/55/p100-used-in-solar-application