Emergency Back-up Synchronising | Case Studies
Ceylinco Reality Plaza is a large shopping complex with 200 up-market shops, a 300 seat cinema and large food park. Located in the city of Ja-ela, Grampaha District, Sri Lanka, the new shopping comples required an emergency back-up power supply in the event of a mains failure.The project was completed in March 2007 giving the company 3x 500KVA synchronising generators with Volvo 1641 electronic engines. DSE5510 modules were fitted to the panel to provide synchronisng, control and...
https://www.deepseaelectronics.com/casestudies/26/emergency-back-up-synchronisingSynchronising System- Europe - Italy | Case Studies
Pictured is the Azienda Ospedaliera G Rummo (hospital) in Benevento, Italy, which recently installed a new sychronising system for emergency standby application.The system used Iveco engines along with DSE5510 control systems for synchronising and automatic start..Italian distributor Bruno Srl completed the installation of the system in 2007 and provide aftersales service through a maintenance contract.
https://www.deepseaelectronics.com/casestudies/27/synchronising-system-europe-italyMobile Gen-Set Application | Case Studies
The end location of a genset is often not a perfect environment. Sets are expected to operate in tough environmental conditions that require high performance and reliability, despite their tough setting. Whilst the mechanics of the engine and alternator are one thing, the generators cannot operate without a reliable control system. Modern electronic controllers that are on the market today offer sophisticated functionality, but can they withstand the continued presence of vibration and...
https://www.deepseaelectronics.com/casestudies/29/mobile-gen-set-applicationPharmaceutical Load Sharing Installation | Case Studies
Astra Zenica is one of the world’s leading pharmaceutical companies. There are approximately 1,200 co-workers in Lund, working with research and development of new medicines and medical aids used in the battle against respiratory disorders.The Caterpillar dealer of Sweden, Pon Power AB, were commissioned to provide emergency power back-up with automatic mains failure detection for the research plant, and Pon Power came to DSE distributor Jo´s Marin for the control solution. Gensets...
https://www.deepseaelectronics.com/casestudies/30/pharmaceutical-load-sharing-installationVattenfall Back-Up Load Sharing Project | Case Studies
Government owned Swedish energy company, Vattenfall, needed a reliable back-up power supply to ensure 24 hour operation of 3 of the biggest hydro-power plants in the north of Sweden.DSEs distributor Jo’s Marin & Industrielektriska AB, won the contract to provide 7 Volvo Gensets 1642, 450 Kva, each one fitted with a DSE5520 module to provide auto start on detection of a mains failure. The modules also give sophisticated monitoring and control of the engines, remote control and a soft...
https://www.deepseaelectronics.com/casestudies/32/vattenfall-back-up-load-sharing-projectHotel Load Sharing System | Case Studies
Motor Cummins, con gobernador 3044196 Generador Stamford con regulador MX 341 Módulo DSE 5520 v7, 450kW 220vCA 60HzCancún, Quintana Roo Zona Hotelera.
https://www.deepseaelectronics.com/casestudies/33/hotel-load-sharing-systemLoad Sharing & Peak Shaving System | Case Studies
Motor Cummins KTA 19; Gobernador de velocidad 3044196 Generador Stamford; Regulador de voltaje MX341 Módulo DSE 5520 v5 220vCA, 60Hz Monterrey, Nuevo León Parque Fundidora
https://www.deepseaelectronics.com/casestudies/35/load-sharing-peak-shaving-systemIron Ore Mine Remote Power Project | Case Studies
Hidden away in the South Eastern corner of Guinea is an impressive mountain called Nimba. Because of its remoteness and the steep slopes the area has not been affected by human strife. A large portion of the mountain has rich iron ore deposits and BHP Billiton along with the local mining organisation of SFMG has the rights to extract the ore. A site has been built on the western slopes to accommodate the personal involved in the mining operations.No utility power is available and diesel...
https://www.deepseaelectronics.com/casestudies/17/iron-ore-mine-remote-power-projectEuropean Rental Power Generation Problem Solved | Case Studies
Energyst Rental Solutions is a pan-European company providing turnkey rental solutions for power generation and temperature control (air/liquid heating and cooling).Jo’s Marin were commissioned to solve an installation problem Energyst were having with some rental applications. They needed a control solution that could handle their XQ Series gensets, previoulsy controlled by Woodward EGCP-2 panels. The problem was solved by using the DSE530 module.The system provides automatic mains...
https://www.deepseaelectronics.com/casestudies/31/european-rental-power-generation-problem-solvedUK Emergency Back-up Support | Case Studies
Reliability at Crucial Times.Huddersfield Royal Infirmary and other NHS hospitals throughout the UK choose DSE Auto Start and DSE Auto Transfer Switch & Mains Control modules to support life-critical hospital services.
https://www.deepseaelectronics.com/casestudies/36/uk-emergency-back-up-support