11-Set Load Sharing System | Case Studies
One of the largest shirt manufacturers in the Guangdong Province of China is situated in Dongguan. The factory enjoys high volume worldwide sales. The factory already had an existing PCC paralleling system in operation, providing prime power, but this needed updating due to problems on automatic load demand. DSEs distributor, CECL won the contract after close liaison with the panel builder, to replace the 11-set system with DSE 5510 controllers. Engine specs were 4 x Cummins KTA19...
https://www.deepseaelectronics.com/casestudies/21/11-set-load-sharing-systemReal Estate Project, Pakistan | Case Studies
Park Lane Tower is a high profile complex of luxury apartments, office suites and designer retail shopping outlets. The multi-story building offers 0.5 million square feet of high end commercial real estate in the capital city of Lahore, Pakistan.In a project completed at the end of June 2007, Pyramid Automation provided a synchronising system with mains monitoring for standby power. The system uses CAT-3516 1750Kva x 2 and CAT-3502, 1000Kva x1 engines with Woodward governor 2301. The...
https://www.deepseaelectronics.com/casestudies/22/real-estate-project-pakistanMiddle East Telecommunications Company | Case Studies
Backed by the Abu Dhabi Group, one of the largest financial groups in the Middle East and the single largest foreign investor group in Pakistan, Warid Telecommunications (Pakistan) launched its services in May 2005. Within 80 days of launch, Warid Pakistan claims to have attracted more than 1 million users. According to Pakistan Telecommunication Authority,Warid Telecom currently has more then 10 million subscribers in Pakistan and is ranked as the fourth largest operator. Warid Telecom´s...
https://www.deepseaelectronics.com/casestudies/24/middle-east-telecommunications-companySynchronising System- Europe - Italy | Case Studies
Pictured is the Azienda Ospedaliera G Rummo (hospital) in Benevento, Italy, which recently installed a new sychronising system for emergency standby application.The system used Iveco engines along with DSE5510 control systems for synchronising and automatic start..Italian distributor Bruno Srl completed the installation of the system in 2007 and provide aftersales service through a maintenance contract.
https://www.deepseaelectronics.com/casestudies/27/synchronising-system-europe-italyVattenfall Back-Up Load Sharing Project | Case Studies
Government owned Swedish energy company, Vattenfall, needed a reliable back-up power supply to ensure 24 hour operation of 3 of the biggest hydro-power plants in the north of Sweden.DSEs distributor Jo’s Marin & Industrielektriska AB, won the contract to provide 7 Volvo Gensets 1642, 450 Kva, each one fitted with a DSE5520 module to provide auto start on detection of a mains failure. The modules also give sophisticated monitoring and control of the engines, remote control and a soft...
https://www.deepseaelectronics.com/casestudies/32/vattenfall-back-up-load-sharing-projectHotel Load Sharing System | Case Studies
Motor Cummins, con gobernador 3044196 Generador Stamford con regulador MX 341 Módulo DSE 5520 v7, 450kW 220vCA 60HzCancún, Quintana Roo Zona Hotelera.
https://www.deepseaelectronics.com/casestudies/33/hotel-load-sharing-systemLoad Sharing & Peak Shaving System | Case Studies
Motor Cummins KTA 19; Gobernador de velocidad 3044196 Generador Stamford; Regulador de voltaje MX341 Módulo DSE 5520 v5 220vCA, 60Hz Monterrey, Nuevo León Parque Fundidora
https://www.deepseaelectronics.com/casestudies/35/load-sharing-peak-shaving-systemEuropean Rental Power Generation Problem Solved | Case Studies
Energyst Rental Solutions is a pan-European company providing turnkey rental solutions for power generation and temperature control (air/liquid heating and cooling).Jo’s Marin were commissioned to solve an installation problem Energyst were having with some rental applications. They needed a control solution that could handle their XQ Series gensets, previoulsy controlled by Woodward EGCP-2 panels. The problem was solved by using the DSE530 module.The system provides automatic mains...
https://www.deepseaelectronics.com/casestudies/31/european-rental-power-generation-problem-solvedAuto Transfer Switch System | Case Studies
The system utilised 2 x load sharing generators, controlled by DSE8610s, which were installed into the basement of the apartment block. Each floor of the building was then connected to a DSE333 ATS Controller which controlled the load transfer to and from the generator supply. Using this system applied the load in steps as each floor was transferred. This would avoid a potential step load that may be too large and likely to be in excess of the load acceptance specification of the gensets,...
https://www.deepseaelectronics.com/casestudies/37/auto-transfer-switch-systemAuto Transfer Switch System | Case Studies | DSEAts
The system utilised 2 x load sharing generators, controlled by DSE8610s, which were installed into the basement of the apartment block. Each floor of the building was then connected to a DSE333 ATS Controller which controlled the load transfer to and from the generator supply. Using this system applied the load in steps as each floor was transferred. This would avoid a potential step load that may be too large and likely to be in excess of the load acceptance specification of the gensets,...
https://www.deepseaelectronics.com/ats/casestudies/37/auto-transfer-switch-system/37/auto-transfer-switch-system