STEAM TURBINE APPLICATION - LEBANON | Case Studies | DSEAts
A cardboard manufacturing plant in Lebanon, which makes cardboard from 100% recycled paper and used cardboard, has found a sustainable way to run its operations off grid. Waste is brought to the site and first goes through a separation process to remove the useable paper and cardboard from the rest of the rubbish. This is then made into a pulp to be made into cardboard. The remaining waste is incinerated to generate steam used in the drying process while the remaining steam is used to...
https://www.deepseaelectronics.com/ats/genset/casestudies/48/steam-turbine-application-lebanon/48/steam-turbine-application-lebanon/48/steam-turbine-application-lebanonSanta Express | Case Studies
While thousands of kids are jumping on board the Santa Express at Brampton Valley Way this year, working away behind the scenes to make sure their journey is as magical as possible, is a DSE auto start module. It doesn’t get any more critical than that!
https://www.deepseaelectronics.com/casestudies/44/santa-expressSanta Express | Case Studies | DSEGenset
While thousands of kids are jumping on board the Santa Express at Brampton Valley Way this year, working away behind the scenes to make sure their journey is as magical as possible, is a DSE auto start module. It doesn’t get any more critical than that!
https://www.deepseaelectronics.com/genset/casestudies/44/santa-express/44/santa-expressPeak Shaving Installation, Mexico | Case Studies
Project details:Engine: Cummins KTA 38G4, Cummins Governor 3062322, Generator Marathon and AVR Grameyer.Control Module: DSE5520
https://www.deepseaelectronics.com/casestudies/34/peak-shaving-installation-mexicoEmergency Back-up Power & Synchronising System | Case Studies
Power interruptions are the standard not the exception and it was necessary to have emergency diesel power on hand to keep the manufacturing of tea going at all times. The existing system had three generators:1 x 350kVA Iveco coupled to a Newage alternator with a MX341 AVR, 2 x newer Iveco 400kVAs coupled to Mecc Alte spa alternators fitted with UVR6 regulators.Only two of the three sets would synchronise with each other even though the third could supply power by itself. Synchronising was...
https://www.deepseaelectronics.com/casestudies/16/emergency-back-up-power-synchronising-system11-Set Load Sharing System | Case Studies
One of the largest shirt manufacturers in the Guangdong Province of China is situated in Dongguan. The factory enjoys high volume worldwide sales. The factory already had an existing PCC paralleling system in operation, providing prime power, but this needed updating due to problems on automatic load demand. DSEs distributor, CECL won the contract after close liaison with the panel builder, to replace the 11-set system with DSE 5510 controllers. Engine specs were 4 x Cummins KTA19...
https://www.deepseaelectronics.com/casestudies/21/11-set-load-sharing-systemReal Estate Project, Pakistan | Case Studies
Park Lane Tower is a high profile complex of luxury apartments, office suites and designer retail shopping outlets. The multi-story building offers 0.5 million square feet of high end commercial real estate in the capital city of Lahore, Pakistan.In a project completed at the end of June 2007, Pyramid Automation provided a synchronising system with mains monitoring for standby power. The system uses CAT-3516 1750Kva x 2 and CAT-3502, 1000Kva x1 engines with Woodward governor 2301. The...
https://www.deepseaelectronics.com/casestudies/22/real-estate-project-pakistanMiddle East Telecommunications Company | Case Studies
Backed by the Abu Dhabi Group, one of the largest financial groups in the Middle East and the single largest foreign investor group in Pakistan, Warid Telecommunications (Pakistan) launched its services in May 2005. Within 80 days of launch, Warid Pakistan claims to have attracted more than 1 million users. According to Pakistan Telecommunication Authority,Warid Telecom currently has more then 10 million subscribers in Pakistan and is ranked as the fourth largest operator. Warid Telecom´s...
https://www.deepseaelectronics.com/casestudies/24/middle-east-telecommunications-companySynchronising System- Europe - Italy | Case Studies
Pictured is the Azienda Ospedaliera G Rummo (hospital) in Benevento, Italy, which recently installed a new sychronising system for emergency standby application.The system used Iveco engines along with DSE5510 control systems for synchronising and automatic start..Italian distributor Bruno Srl completed the installation of the system in 2007 and provide aftersales service through a maintenance contract.
https://www.deepseaelectronics.com/casestudies/27/synchronising-system-europe-italyVattenfall Back-Up Load Sharing Project | Case Studies
Government owned Swedish energy company, Vattenfall, needed a reliable back-up power supply to ensure 24 hour operation of 3 of the biggest hydro-power plants in the north of Sweden.DSEs distributor Jo’s Marin & Industrielektriska AB, won the contract to provide 7 Volvo Gensets 1642, 450 Kva, each one fitted with a DSE5520 module to provide auto start on detection of a mains failure. The modules also give sophisticated monitoring and control of the engines, remote control and a soft...
https://www.deepseaelectronics.com/casestudies/32/vattenfall-back-up-load-sharing-project